Concrete structures must be cured a minimum of 28 days prior to application. Surfaces to be coated must be free of grease, standing water and any other contaminants that may impede adhesion. Always check the surface for any bond inhibitors prior to application. Any repairs must be addressed prior to application and should be repaired in accordance with ICRI standards. Concrete must have a surface profile of CSP #3. If concrete does not meet a profile of CSP #3 it must be profiled mechanically to meet CSP #3. Repair all cracks and joints prior to coating application. Bare metal substrates must be prepared to a SSPC SP 1 standard.
Note: Maintaining a consistent storage temperature prior to application will maximize working time. Material should be kept in a cool dry place prior to application.